A Review of Construction Management and Risks

Authors

  • Sumit Paik  Department of Civil Engineering Department, GHRAET, Nagpur, Maharashtra, India
  • Apeksha Janbandhu  Department of Civil Engineering Department, GHRAET, Nagpur, Maharashtra, India
  • Shubham Khastagir  Department of Civil Engineering Department, GHRAET, Nagpur, Maharashtra, India
  • Yogesh Dhage  Department of Civil Engineering Department, GHRAET, Nagpur, Maharashtra, India
  • Ankita Dhabarde  Department of Civil Engineering Department, GHRAET, Nagpur, Maharashtra, India

Keywords:

Construction Management, Risk Analysis, Bridge Construction, Construction Planning, Resource Utilization.

Abstract

Development of extension ventures were started in unpredictable and dynamic issues bringing about conditions of high vulnerability and hazard, which were intensified by requesting many obliges. The general technique was to ponder depends to a great extent on the review poll which will be gathered from different scaffold. A second supposition practice from autonomous specialists and councils that centers around the quality part of the tasks can be presented in the arrangement of foundation transport ventures. In this content there is examine of various literature on construction management and risks.

References

  1. Wu, I., et al., Bridge construction schedule generation with pattern-based construction methods and constraint- based simulation. Advanced engineering informatics, 2010.24(4):p.379 -388.
  2. Kim, J., An investigation of activating duration input modelling by duration variance ratio for simulation- based construction scheduling, 2007.
  3. Srisuwanrat, C.,the sequence step algorithm:A stimulation -based scheduling algorithm for repetitive projects with probabilistic activity durations , 2009,ProQuest, UMI Dissertations Publishing.
  4. Wu, I.,et al . A pattern-based approach for facilitating schedule generation and cost analysis in bridge construction projects.in Proc. Of 26th CIB-W78 conference on managing IT in construction 2009.
  5. Marzouk, M., H.Z. EI-Dein, and M. EI- Said, Application of computer simulation to construction of incremental launching bridges. Journal of Civil Engineering and Management, 2007.13 (1):p. 27 – 36.
  6. Ailland,K.,H., J. Bargstadt, and S.Hollermann.Construction process in simulation in bridge building based on significant day-to-day data.In proceedings of the Winter Simulation Conference. 2010.Winter Simulation Conference.
  7. Sterman , J.,D.,System dynamics modelling for project management.Unpulished manuscript,Cambridge,MA, 1992.
  8. AbouRizk, S.M. and S.P.Dozzi,Appilation of computer simulation in resolving construction dispute. Journal of construction engineering and management,1993.119(2):p. 355-373.
  9. Huang,R.,A.M.Grigoriadis,and D.W.Halpil. Simulation of cable-stayed bridges using DISCO.in Proc.,1994 Winter Simulation Conference, IEEE,Piscetaway,N.J.1994.
  10. Chan,W.H.and M.Lu. Logistics and operation simulations in precast viaduct construction:case study.in Proceedings of 2005 ASCE Internation Conference on Computing in Civil Engineering. 2005.
  11. Marzouk,M.,H.Said, and M. EI-Said ,Special- Purpose Simulation Model For Balance Cantilever Bridges. Journal Of Bridge Engineering, 2008.13(2): p. 122- 131.

Downloads

Published

2019-03-16

Issue

Section

Research Articles

How to Cite

[1]
Sumit Paik, Apeksha Janbandhu, Shubham Khastagir, Yogesh Dhage, Ankita Dhabarde, " A Review of Construction Management and Risks, International Journal of Scientific Research in Science, Engineering and Technology(IJSRSET), Print ISSN : 2395-1990, Online ISSN : 2394-4099, Volume 5, Issue 6, pp.312-317, March-2019.