A Review on Designing of Dam And De-silting

Authors

  • Jayjit Shelke  Student, Civil Engineering Department, Dr. Babasaheb Ambedkar College of Engineering and Research, Nagpur, Rashtrasant Tukdoji Maharaj University, Nagpur, Maharashtra, India
  • Pranay Dhopte  Student, Civil Engineering Department, Dr. Babasaheb Ambedkar College of Engineering and Research, Nagpur, Rashtrasant Tukdoji Maharaj University, Nagpur, Maharashtra, India
  • Sagar Talegaonkar  Student, Civil Engineering Department, Dr. Babasaheb Ambedkar College of Engineering and Research, Nagpur, Rashtrasant Tukdoji Maharaj University, Nagpur, Maharashtra, India
  • Dhanshree Gilbile  Student, Civil Engineering Department, Dr. Babasaheb Ambedkar College of Engineering and Research, Nagpur, Rashtrasant Tukdoji Maharaj University, Nagpur, Maharashtra, India
  • Miss. Radhika Kherde  Department of Civil Engineering, Dr. Babasaheb Ambedkar College of Engineering and Research, Nagpur, Rashtrasant Tukdoji Maharaj University, Nagpur, Maharashtra, India

Keywords:

sedimentation causes and effect de-silting for dams, diversion tunnel and hydro power plant

Abstract

This paper presents a survey report of design of dam with de-silting. Siltation is most often causes by soil and sediment spill. Due to silting capacity of live storage of reservoir decreases rapidly as well as silt also effects on the durability of structure of dam and the usual method of river flow diversion involves construction of tunnel and cofferdams. The cost of diversion work could be as high as 10-20% of total dam construction cost. The cost of diversion works depends on factors such as the tunnel dimension and intended tunnelling support measures during and after excavation. The quality of the rock through which the tunnel should be excavated and dimension of the upstream and downstream cofferdams. The optimum diameter and the total diversion cost are directly related to the river flood discharge. According to report of hydro power plant in India, there are various renewable resources like sun, wind, water, ocean and tidal. The power generation using hydro resources offers sustainable zero energy input cost, zero greenhouse gases emission, low operation and maintenance cost. These are currently near 17% of the world total power generation is based on hydro resources and it share to renewable power generation is 70%. All the systematic process which are discuss in paper.

References

  1. Mama and Okafor, (2015) “siltation in reservoirs”Department of Civil Engineering, Faculty of Engineering, University of Nigeria.
  2. Radhika Kherde, faculty of civil engineering department, DBACER, Nagpur university.
  3. Leo C and van Rijn,(2001) “Sedimentation of sand and mud in reservoirs in rivers”
  4. Jing-San Hwang, “Mitigation of reservoir sedimentation” water resources management, Taiwan Provincial Water Conservancy Bureau, Taichung, Taiwan.
  5. Ahmed M.J. - Assessment of Geological and Technical inputs for optimization of Designs of Indira Sagar Project, M.P.India. M. Krishnamoorthy, G.C. Vyas, Rajeev Sachedeva – Civil design aspects of Indira Sagar Project. Tripathi D.C. Amitabh Sharan, - Shearzone treatment : A case study of Indira Sagar Project on Narmada River, M.P.India.
  6. Rajan A. T., 2000. Power Sector Reform in Orissa: an ex-post analysis of the causal factors, Energy Policy, 28: 657-669.
  7. MoEF (Ministry of Environment and Forests) 1980. Forest (Conservation) Act, 1980 with Amendments Made in 1988.
  8. MoP (Ministry of Power), 2008. Hydro Power Policy 2008. (New Delhi: Ministry of Power, Government of India).
  9. MoP (Ministry of Power), 1998. Policy on Hydro Power Development. (New Delhi: Ministry of Power, Government of India).
  10. MoRD (Ministry of Rural Development), 2007. The National Rehabilitation and Resettlement Policy,2007. (New Delhi: Department of Land resources, Land reforms Division, Government of India).
  11. Nandimath O. V., 2009. Oxford handbook of environmental decision making in India: An EIA model, New Delhi: Oxford University Press.
  12. Sectoral Overview Report on Hydropower Development in India, AHEC, IIT Roorkee, February 2007.
  13. P. Saxena and Arun Kumar, “Small hydropower development in India”, special publication 25 years of Renewable Energy in India, MNRE, New Delhi,2007
  14. Central Electricity Authority, Hydro Development Plan for 12th Five Year Plan, New Delhi, Sept 2008

Downloads

Published

2019-03-16

Issue

Section

Research Articles

How to Cite

[1]
Jayjit Shelke, Pranay Dhopte, Sagar Talegaonkar, Dhanshree Gilbile, Miss. Radhika Kherde, " A Review on Designing of Dam And De-silting, International Journal of Scientific Research in Science, Engineering and Technology(IJSRSET), Print ISSN : 2395-1990, Online ISSN : 2394-4099, Volume 5, Issue 6, pp.126-129, March-2019.