Planning and Scheduling of High Rise Building Using Primavera

Authors

  • Harshali Pawar  Student, Department of Civil Engineering, Loknete Gopinathji Munde Institute of Engineering and Research, Nashik, Maharashtra, India
  • Ritali Wagh  Student, Department of Civil Engineering, Loknete Gopinathji Munde Institute of Engineering and Research, Nashik, Maharashtra, India
  • Shrutika Shahane  Student, Department of Civil Engineering, Loknete Gopinathji Munde Institute of Engineering and Research, Nashik, Maharashtra, India
  • Maya Kakad  Student, Department of Civil Engineering, Loknete Gopinathji Munde Institute of Engineering and Research, Nashik, Maharashtra, India
  • Vaishnavi Kakad  Student, Department of Civil Engineering, Loknete Gopinathji Munde Institute of Engineering and Research, Nashik, Maharashtra, India
  • Prof. S. S. Bodke  Professor, Civil Engineering Department, Loknete Gopinathji Munde Institute of Engineering and Research Nashik, Maharashtra, India

Keywords:

Planning, Scheduling, Project Management

Abstract

Planning and scheduling is important role in construction projects because of the increasing complexities in construction field. Construction Planning is the necessary warning to Scheduling and determining general sequence, defining labor tasks, construction methods and assigning responsibilities and cost overruns. Inappropriate planning can lead to major delays in the project work. For the planning and scheduling huge amount of paperwork is needed, this makes very difficult to handle large construction project through management. These problems can be solved using a project management software which helps to give a planned approach to planning. The benefits of effective planning, scheduling and control of construction projects are: reduced construction time, reduced cost overruns and the minimization of disputes. These benefits accrue to the contractors, owners, suppliers and workers in the form of improvements in productivity, quality and resource utilization. It helps to avoid the construction interruption, keep the continuity of crew work, and avoid the delay of construction and cost overruns.

References

  1. T. Subramani, A. Sarkunam, J. Jayalakshmi. (June, 2014), 'Planning and Scheduling of High Rise Building Using Primavera', int. journal of engineering research and applications, vol. 4, ISSN: 2248-9622, Issue 6(Version 5), pp.134-144.
  2. B. S. K. Reddy, S K. Nagaraju, M D Salman (2015) "A Study on Optimization of Resources for Multiple Projects By Using Primavera" Journal of Engineering Science and Technology, Vol. 10, No. 02 (2015) 235-248
  3. Unmesh. Y. Polekar, Rohit. R. Salgude "Planning, Scheduling and Tracking of a residential Project using Primavera software" International journal of advance research in computer science and management studies,ISSN: 2321-7782, Vol. 03, Issue 5, May 2015.
  4. Andrew Fernans,Tom and Sachin Paul. "Project monitoring and control using primavera."International Journal of Innovative Research in Science, Engineering and Technology 2.3 (2013): 762-771.
  5. Regina Mary and V. Rathinakumar (2015), Reducing Construction Constraints using Primavera, Indian Journal of Science and Technology, 8(14), 1-7.

Downloads

Published

2018-04-30

Issue

Section

Research Articles

How to Cite

[1]
Harshali Pawar, Ritali Wagh, Shrutika Shahane, Maya Kakad, Vaishnavi Kakad, Prof. S. S. Bodke, " Planning and Scheduling of High Rise Building Using Primavera, International Journal of Scientific Research in Science, Engineering and Technology(IJSRSET), Print ISSN : 2395-1990, Online ISSN : 2394-4099, Volume 4, Issue 4, pp.533-537, March-April-2018.