Planning and Scheduling of High Rise Building Using Primavera

Authors(6) :-Harshali Pawar, Ritali Wagh, Shrutika Shahane, Maya Kakad, Vaishnavi Kakad, Prof. S. S. Bodke

Planning and scheduling is important role in construction projects because of the increasing complexities in construction field. Construction Planning is the necessary warning to Scheduling and determining general sequence, defining labor tasks, construction methods and assigning responsibilities and cost overruns. Inappropriate planning can lead to major delays in the project work. For the planning and scheduling huge amount of paperwork is needed, this makes very difficult to handle large construction project through management. These problems can be solved using a project management software which helps to give a planned approach to planning. The benefits of effective planning, scheduling and control of construction projects are: reduced construction time, reduced cost overruns and the minimization of disputes. These benefits accrue to the contractors, owners, suppliers and workers in the form of improvements in productivity, quality and resource utilization. It helps to avoid the construction interruption, keep the continuity of crew work, and avoid the delay of construction and cost overruns.

Authors and Affiliations

Harshali Pawar
Student, Department of Civil Engineering, Loknete Gopinathji Munde Institute of Engineering and Research, Nashik, Maharashtra, India
Ritali Wagh
Student, Department of Civil Engineering, Loknete Gopinathji Munde Institute of Engineering and Research, Nashik, Maharashtra, India
Shrutika Shahane
Student, Department of Civil Engineering, Loknete Gopinathji Munde Institute of Engineering and Research, Nashik, Maharashtra, India
Maya Kakad
Student, Department of Civil Engineering, Loknete Gopinathji Munde Institute of Engineering and Research, Nashik, Maharashtra, India
Vaishnavi Kakad
Student, Department of Civil Engineering, Loknete Gopinathji Munde Institute of Engineering and Research, Nashik, Maharashtra, India
Prof. S. S. Bodke
Professor, Civil Engineering Department, Loknete Gopinathji Munde Institute of Engineering and Research Nashik, Maharashtra, India

Planning, Scheduling, Project Management

  1. T. Subramani, A. Sarkunam, J. Jayalakshmi. (June, 2014), 'Planning and Scheduling of High Rise Building Using Primavera', int. journal of engineering research and applications, vol. 4, ISSN: 2248-9622, Issue 6(Version 5), pp.134-144.
  2. B. S. K. Reddy, S K. Nagaraju, M D Salman (2015) "A Study on Optimization of Resources for Multiple Projects By Using Primavera" Journal of Engineering Science and Technology, Vol. 10, No. 02 (2015) 235-248
  3. Unmesh. Y. Polekar, Rohit. R. Salgude "Planning, Scheduling and Tracking of a residential Project using Primavera software" International journal of advance research in computer science and management studies,ISSN: 2321-7782, Vol. 03, Issue 5, May 2015.
  4. Andrew Fernans,Tom and Sachin Paul. "Project monitoring and control using primavera."International Journal of Innovative Research in Science, Engineering and Technology 2.3 (2013): 762-771.
  5. Regina Mary and V. Rathinakumar (2015), Reducing Construction Constraints using Primavera, Indian Journal of Science and Technology, 8(14), 1-7.

Publication Details

Published in : Volume 4 | Issue 4 | March-April 2018
Date of Publication : 2018-04-30
License:  This work is licensed under a Creative Commons Attribution 4.0 International License.
Page(s) : 533-537
Manuscript Number : IJSRSET184495
Publisher : Technoscience Academy

Print ISSN : 2395-1990, Online ISSN : 2394-4099

Cite This Article :

Harshali Pawar, Ritali Wagh, Shrutika Shahane, Maya Kakad, Vaishnavi Kakad, Prof. S. S. Bodke, " Planning and Scheduling of High Rise Building Using Primavera, International Journal of Scientific Research in Science, Engineering and Technology(IJSRSET), Print ISSN : 2395-1990, Online ISSN : 2394-4099, Volume 4, Issue 4, pp.533-537, March-April-2018.
Journal URL : http://ijsrset.com/IJSRSET184495

Article Preview

Follow Us

Contact Us