Comparative Analysis of Risk Reduction Using PERT/CPM Techniques
DOI:
https://doi.org/10.32628/IJSRSET196521Keywords:
Risk Optimization, Probability Analysis, Comparative Analysis, Simulation Technique.Abstract
This paper analyzed the traditional probability analysis method for duration risk in program evaluation and review technique (PERT) and Critical Path Method (CPM). On the basis of that it simulates the project’s duration and analyzes the risk by Monte Carlo simulation method. The PERT/CPM produce begins with the hard work of developing an estimate of the cost each activity when it is performed in the planning way (including any crashing).
References
- D. G. Malcolm,C.E. Clark and W. Fazar . "Application of a Technique for Research and De-velopment ProgramEvaluation". OPERATIONS RESEARCH Vol.7, No. 5, September–Octo-ber 1959 : 646–669.
- Aravind.M, Aravindhababu .V, Balamurugnan .K. "Determining an Accurate Estimate of a Project Completion Time Using Simulation". International Journal of Innovative Research in Science, Engineering and Technology,Volume 2, Special issue2, Feb 2015 : 82-85
- Yang Min, Li Shou-rong . "Influence of Behavioral Factors on Project Schedule Manage-ment: a Monte Carlo Method". 25th Chinese Control and Decision Conference (CCDC),978-1-4673-5534-6/13/$31.00c ,IEEE 2013 : 4831-4835
- Nasser Eddine Mouhoub , Abdelhamid Benhocine . "An efficient algorithm for generating AoA networks" .Information System department, Qassim University, Saudi Arabia,arXiv preprint arXiv:1203.3203 --arxiv.org, 2012 : 1-7 .
- Wayne A. Haga,Tim O’keefe . "CRASHING PERT NETWORKS: A SIMULATION APPROACH". Paper presented at the 4th International conference of the Academy of Business and Ad-ministrative Sciences Conference Quebec City, Canada July 12-14, 2001 : 1-15.
- Richard T. Βoati . "The Practicalities of PERT ". IEEE transactions on engineering manage-ment, March 1963: 3-6.
- Nasser Eddine Mouhoub , Hocine Belouadah. "A new method for constructing a minimal PERT network, (APM) Applied Mathematical modeling". Elsevier ISSN: 0307904X, Vol. 35, Issue: 9, 2011: 4575-4588
- Thaeir Ahmed Saadoon Al Samman. "FUZZY PERT FOR PROJECT MANAGEMENT". Interna-tional Journal of Advances in Engineering & Technology, © IJAET, ISSN:22311963, Sept,2014.1150-1160
- WILLIAM J. McBRIDE. "Pert and the Beta Distribution". IEEE Transactions On Engineering Management , VOL. EM-14, NO. 4. December 1967. 166-169
- LeRoy F. Simmons. "Project Management - (CPM) And PERT Simulated With Process Model".IEEE winter simulation conference, 2002:1786-1788
- Wanan Cui, Jiajun Qin, and Chaoyuan Yue. "Criticality Measurement in PERT Net-works". IEEE International Conference on Systems, Man, and Cybernetics October 8-11, 2006:703-706
- Chen-Tung Chen and Sue-Fen Huang. "Applying fuzzy method for measuring criticality in project network". Published by Elsevier Inc, Science Direct, Information Sciences 2007: 2448–2458
- Zhang Yun-ning and Sun Xi-xi. "Research on improved PERT model in analysis of schedule risk of project". 978-0-7695-3997-3/10 $26.00 © IEEE DOI 10.1109/ICEE.2010.699,2010 : 2768-2771
- Robert Might. "An Evaluation of the Effectiveness of Project Control Systems". IEEE Trans-actions on engineering management,VOL. EM-31, NO. 3, AUGUST 1984 : 127-137
- D. Hulett, "Practical Schedule Risk Analysis" Farnham, Surrey, United Kingdom, 2009: 1-6
- Zhaoni Kong1, Jianping Zhang, "Risk Assessment of Plan Schedule by Monte Carlo Simula-tion" International Conference on Information Technology and Management Innovation, 2015: 509-513
Downloads
Published
Issue
Section
License
Copyright (c) IJSRSET

This work is licensed under a Creative Commons Attribution 4.0 International License.