Experimental Investigation to Deploy Overall Equipment Effectiveness (OEE) In CNC Machining Line of an Automobile Component Production Industry Using TPM

Authors

  • B. Logesh  Assistant Professor, Department of Mechanical Engineering, Sree Sakthi Engineering College, Karamadai, Coimbatore, Tamil Nadu, India
  • R. Kuppuraj  UG Scholar, Department of Mechanical Engineering, Sree Sakthi Engineering College, Karamadai, Coimbatore, Tamil Nadu, India
  • Amal Augustine  UG Scholar, Department of Mechanical Engineering, Sree Sakthi Engineering College, Karamadai, Coimbatore, Tamil Nadu, India

Keywords:

5S, Total productive maintenance (TPM), Overall equipment effectiveness (OEE), 5S, CNC Machining Line, Autonomous maintenance, Preventive maintenance.

Abstract

Productivity plays a vital role in real time industries in order to improve the output percentage in machining line. This Research complies with implementing Total Productive Maintenance in CNC Machining line in an automobile component manufacturing company. Industries in current scenario are spending huge amount in implementing new machines and equipments, but unfortunately concentration to improve productivity become less by achieving maximum productivity from a machine for which it is really designed for. Normal behaviour of machine is defined in an order, such as minor loses in time and deviations from actual designed capability. 5S Technique is implemented in order to implement the Total Productive Maintenance (TPM), which is part of implementing a cognitive maintenance plan with involvement of everyone from Top management to lower level employees throughout the production plan of equipments in an organization. Research comes up with neat and tidy work environment, improved morale of employees, creating maximum effectiveness of equipments which results in Overall Equipment Effectiveness (OEE). Previous results of the production line are compared with Research results and effectiveness of equipments. At the end of the report over all equipment effectiveness OEE is compared with previous results.

References

  1. Aaditya choubey , 2012, ‘Study The Initiation Steps Of Total Productivity Maintenance In An Organization And Its Effect In Improvement Of Overall Equipment Efficiency’, vol. 2, no. 4. pp. 1709-1713.
  2. Amit Kumar Gupta, Dr. R. K. Garg, 2012, ‘OEE Improvement by TPM Implementation: A Case Study’, vol. 1, no. 1.
  3. Badli Shah M.Y, 2012, ‘Total Productive Maintenance: A Study of Malaysian Automotive SME’, vol. 3, no. 5.
  4. Gautam Kocher, Ravinder Kumar, Amandeep Singh, Sukhchain Singh Dhillon, 2012, ‘An Approach for Total Productive Maintenance and Factors Affecting its Implementation in Manufacturing Environment’, vol. 3, no. 1. pp. 41-47.
  5. Goyal Ravi Kumar, Maheshwari Kapil, 2013, ‘Maintenance: From Total Productive Maintenance to World Class Maintenance, vol. 2, no. 1. pp. 1-23.
  6. Halim Mad Lazim, Mohamed Najib Salleh, Chandrakantan Subramaniam, Siti Norezam Othman,2013, ‘Total Productive Maintenance and Manufacturing Performance: Does Technical Complexity in the Production Process Matter?’, vol. 4, no. 6.
  7. Hemant Singh Rajput, Pratesh Jayaswal, 2012, ‘A Total Productive Maintenance (TPM) Approach To Improve Overall Equipment Efficiency’, vol. 2, no. 6. pp. 4383-4386.
  8. I.P.S. Ahuja, Pankaj Kumar, ‘A case study of total productive maintenance implementation at precision tube mills’, vol. 241, pp.1355-2511.
  9. Ireland,F, Dale,BG, 2001, ‘A study of total productive maintenance implementation’, vol. 7, no. 3. pp. 183-191.
  10. Islam H. Afefy, 2013, ‘Implementation of Total Productive Maintenance and Overall Equipment Effectiveness Evaluation’ , vol. 13, no. 1.
  11. Kamran Shahanaghi , Seyed Ahmad Yazdian, 2009, ‘Analyzing the effects of implementation of Total Productive Maintenance (TPM) in the  manufacturing companies: A system dynamics approach’, vol. 5, no. 2. pp. 120-129.
  12. Melesse Workneh Wakjira, Ajit Pal Singh, 2012, ‘Total Productive Maintenance: A Case Study in Manufacturing Industry’, vol. 12, no. 1.
  13. Muruganantham,VR, Sindhu Kavi,M, Raghavendra Prabhu,S, 2014, ‘Analysis and Implementation of Total Productive maintenance, Kanban and JIT Systems In Small Scale Polymer Industry’, vol. 3, no. 4.
  14. One Yoon Seng, Muhamad Jantan, ‘Implementing Total Productive Maintenance (Tpm) In Malaysian Manufacturing Organisation : An Operational Strategy Study’, vol. 3, no. 7.
  15. Pradeep Kumar, Dr. K. V. M. Varambally, Dr. Lewlyn L.R. Rodrigues, 2012, ‘A Methodology for Implementing Total Productive Maintenance in Manufacturing Industries–A Case Study’, vol. 5, no. 2. pp. 32-39.
  16. Prasanth S. Poduval, Dr. Pramod ,VR, Dr. Jagathy Raj ,VP, 2013,  ‘Barriers In TPM Implementation In Industries’, vol. 2, no. 5.
  17. Ranjeet M. Jadhav, Mr.Morosin Alessandro, Prof.S.H.Sawant, ‘Total Productive Maintenance Theoretical Aspect: A  Journey Towards Manufacturing Excellence’, vol. 1, no. 1.

Downloads

Published

2017-12-31

Issue

Section

Research Articles

How to Cite

[1]
B. Logesh, R. Kuppuraj, Amal Augustine, " Experimental Investigation to Deploy Overall Equipment Effectiveness (OEE) In CNC Machining Line of an Automobile Component Production Industry Using TPM, International Journal of Scientific Research in Science, Engineering and Technology(IJSRSET), Print ISSN : 2395-1990, Online ISSN : 2394-4099, Volume 3, Issue 8, pp.99-105, November-December-2017.