Risk Assessment Tunnel Construction with Prevention
Keywords:
FEM Analysis, TBM, AS/NZSAbstract
Construction projects are often faced with complex challenges; all of which lead to difficult decisions and possibly disputes regarding liability of the parties. This research investigates the risks associated with tunnelling construction and uses the information to create a simplified risk register. The risk register may be used as areference guide of responsible and proactive project planning that reflects industry standards, lessons learned and the currency of understanding of the owners and contractors. Additionally, a checklist was created to simplify risk assessment during each phase of construction by identifying possible hazards for each critical task of the project. By openly acknowledging and discussing risks in the contract, the author believes that the tone of the project will be set towards mutually beneficial progress and co-operation and the lessons learned on each project will also be easier to recreate and utilize on future projects.
References
- M.S. RAHUL , Case Study On Design And Construction Of Tunnel International Journal Of Engineering Trends And Technology (IJETT) – Volume 13 Number 8 – Jul 2014 .
- R. SRINIVASAN, Tunnel And Harbor Engineering.
- NATIONAL HIGHWAY INSTITUTE, Tunnel Design Manual FHWA -NHI -10-034 December 2009.
- KIMOYA LEE GIEL-TUCKER , Managing Tunneling Construction Risks .
- SOREN DEGN ESKESEN, PER TENGBORG, Guideline For Tunneling Risk Management, Tunneling And Underground Space Technology ,19(2004) 217-237.
- A CODE OF PRACTICE FOR RISK MANAGEMENT OF TUNNEL WORKS, The International Tunneling Insurance Group.
Downloads
Published
Issue
Section
License
Copyright (c) IJSRSET