Directions for Road Management Plans and Strategies for Regional Development in Aceh Besar Regency, Indonesia

Authors

  • Irhamdi  Regional Planning Science Study Program, Post-Graduate School, IPB University, Bogor, Indonesia
  • Santun R. P. Sitorus  Regional Planning Science Study Program, Post-Graduate School, IPB University, Bogor, Indonesia
  • Sukmana Soma  Bogor, Indonesia3Faculty of Engineering, Krisnadwipayana University, Bekasi, Indonesia

DOI:

https://doi.org/10.32628/IJSRSET207563

Keywords:

Road handling, Scalogram, AHP, SWOT.

Abstract

Since Aceh Besar Regency has limited funds, it should focus more on road transportation services on improving existing roads. This study aims to determine the condition of existing roads, analyze the level of development of the sub-regency, analyze and develop road management plans and strategies in Aceh Besar Regency. Descriptive analysis methods, GIS, and scalogram to identify the level of development in the sub-regency and methods to get decisions about road management plans and strategies in this study used the AHP and SWOT methods. The results of the study show that the existing road conditions are around 1,644.36 KM in good condition, 330.48 KM and 387.08 KM in moderate condition, while the rest are still in a damaged condition, for the type of asphalt surface around 761.91, while the rest is still in the form of gravel and soil. The scalogram results show 3 regency are service centers (Hierarchy I), 9 regency are service sub-centers (Hierarchy II), and 11 sub-regency are hinterland areas (Hierarchy III). Based on the AHP analysis, it is found that the potential for tourism objects is more dominant in determining road handling, namely there are 5 priority sections and in the SWOT analysis using the ST (Strenght-Threats) diversification strategy (1) Road handling is carried out by the regional government of Aceh Besar Regency in developing regional potential such as regional tourism objects, markets and agriculture, (2) The government focuses on building damaged road infrastructure for smooth accessibility, (3) Aceh Besar Regency Government utilizes the private sector or investors in road handling (4) The regional government aims to maintain road quality for convenient access to all territory.

References

  1. Afriansyah R, Wicaksono A and Djakfar L. 2012. Priority Determination of Road Network Development to Support the Strategic Areas of Sumbawa Island. Journal of Civil Engineering. 6 (3): 214-225. (In Indonesian)
  2. Bhattacharya S. 2010. Infrastructure in India: An Economy Transitioning from public to private provision. Journal of Economics. 38 (1): 52-70. (In Indonesian)
  3. Febrianto, Murtilaksono K and Anwar S. 2019. Environmental Carrying Capacity Based on Ecological Footprint in Pattallassang District, Gowa Regency. IJSRSET. 6(4): 251-259.
  4. Hardiyatmo HC. 2015. Road Pavement Planning & Land Investigation, Yogyakarta: UGM Press. (In Indonesian)
  5. Jhingan ML. 2012. Economic Development and Planning. Jakarta (ID): PT. Raja Grafindo Persada. (In Indonesian)
  6. Ma'ruf YP and Daud J. 2013. The effect of road infrastructure investment on regional economic growth in the southern coastal districts of West Sumatra Province. Civil Engineering. 2 (3): 1-11. (In Indonesian)
  7. 2010. Techniques and Applications of Compound Criteria Decision Making. Jakarta (ID): PT. Gramedia Widiasarana Indonesia. (In Indonesian)
  8. Maqin A. 2011. The effect of infrastructure conditions on economic growth in West Java. Trichonomics. 10 (1): 10-18. Bogor (ID): IPB. (In Indonesian)
  9. Mbolian Y. 2013. Level of  Damage to Roads as the Basis for Policy on Road Infrastructure Maintenance [thesis]. Makassar (ID): Infrastructure Planning Engineering Program Hasanuddin University Faculty of Engineering. (In Indonesian)
  10. Miri G, Barus B and Soma S. 2014. Analysis of Road Networks and Priorities for Their Handling for Regional Development in Tanah Toraja Regency. Journal of Environmental Soil. 16 (1): 1-8. (In Indonesian)
  11. Muntasar TF, Kumaat EJ and Mandagi RJM. 2011. Priority Scale Determination of Road Development Projects in Banggai Islands Regency Using the Analytical Hierarchy Project. Scientific Journal of Media Engineering. 1 (1): 38-46. (In Indonesian)
  12. Munthe RB. 2015. Determining Priorities for Handling National Roads in Bangka Island, Journal of Civil Engineering Communication Media. 21 (1): 57-67. (In Indonesian)
  13. Muta'ali L. 2014. Regional Development Planning Based on Disaster Risk Reduction. Yogyakarta (ID): Publishing Agency, Faculty of Geography UGM. (In Indonesian)
  14. Novitasari F and Maryati S. 2015. The Influence of Infrastructure Development on Regional Development in Indonesia. Journal of Urban and Regional Planning. 3 (2): 287-294. (In Indonesian)
  15. Government of the Republic of Indonesia. 2010. Regulation of the Minister of Public Works Number 14 / PRT / M / 2010 of 2006 concerning Roads. Jakarta (ID): State Secretariat. (In Indonesian)
  16. Purnama F, Pravitasari AE and 2019. Development Strategy for Smallholding Plantation Commodities in West Aceh Regency. IJSRSET. 6(4): 182-193.
  17. Riadi A. 2015. Analysis of regional development and direction of priority road network handling in Bogor Regency [Thesis]. Bogor (ID): Bogor Agricultural University. (In Indonesian)
  18. Rosdiana D. 2011. Analysis of Superior Agricultural Commodities and Development Strategies in Ciamis Regency, West Java Province [Thesis]. Bogor (ID): Bogor Agricultural University. (In Indonesian)
  19. Rustiadi E and Panuju D.R. 2013. Regional Development Planning Analysis Techniques. Bogor (ID): Regional Development Planning Division. Department of Soil and Land Resources. Bogor Agricultural Institute. (In Indonesian)
  20. Saaty TL, Sodenkamp M. 2010. The analytic hierarchy and analytic network measurement processes: The measurement of intangibles, in Zopounidis, C. and Pardalos, P. M. (eds.) Handbook of Multicriteria Analysis. Germany: Springer Berlin Heidelberg, pp. 91-166. 4. (In Indonesian)
  21. Saleh DZ. 2014. Mozaik on Indonesia's Infrastructure Problems. Depok (ID): IPB. (In Indonesian)
  22. 2014. Strategic Management. Bandung (ID): First Printing. Publisher Refika Aditama. (In Indonesian)
  23. Shen Y, Tam W.Y.V, Tam L and Ji Y.B. 2010. Project Feasibility Study: Key to the Success of Sustainable and Social Implementation Responsible Construction Management Practices. Journal of cleaner production. 18 (3): 254 - 259.
  24. 2014. Economic Development. Bandung (ID): Alfabeta. (In Indonesian)
  25. Sudarya D, Sitorus SRP and Firdaus M. 2013. Analysis of Regional Economic Development For Subdistrict Development Directives in the Coastal Area of Garut Regency. Geomatics Scientific Journal. 19 (2): 134-140. (In Indonesian)
  26. Syarifudin D, Riza FI. 2014. Analysis of Regional Typology as Direction for Regional Development Harmonization Policy: Study Areas of Yogyakarta Province, East Nusa Tenggara Province, South Sulawesi Province and Bali Province, Journal of Planology UNPAS. 1 (1): 59-74. Bandung (ID): Pasundan University Planology Engineering Study Program. (In Indonesian)

Downloads

Published

2020-10-30

Issue

Section

Research Articles

How to Cite

[1]
Irhamdi, Santun R. P. Sitorus, Sukmana Soma "Directions for Road Management Plans and Strategies for Regional Development in Aceh Besar Regency, Indonesia" International Journal of Scientific Research in Science, Engineering and Technology (IJSRSET), Print ISSN : 2395-1990, Online ISSN : 2394-4099, Volume 7, Issue 5, pp.368-380, September-October-2020. Available at doi : https://doi.org/10.32628/IJSRSET207563