Development and Modelling of Milling Fixture for Enhancement in Productivity

Authors

  • Ingale R.P.  Bachelor of Mechanical Engineering, Department of Mechanical Engineering, SIEM Nashik India
  • Nalawade P. S  Bachelor of Mechanical Engineering, Department of Mechanical Engineering, SIEM Nashik India
  • Shinde S. D.  Bachelor of Mechanical Engineering, Department of Mechanical Engineering, SIEM Nashik India
  • Shukla A. S.  Bachelor of Mechanical Engineering, Department of Mechanical Engineering, SIEM Nashik India 5Assistant Professor, Department of Mechanical Engineering SIEM, Nashik, India
  • Bodke S. E.  

Keywords:

Lead Time, Work Stud, Milling Fixture, Time study, Bottleneck Workstation

Abstract

Number of operations required to be done om a single workpiece results into huge set up time and manufacturing lead time. Milling machine is one of the most widely used machine on which number of jobs can be manufactured. Due to which the machine is overutilize so, any arrangement / tool / device which reduces its machining time is desirable. Milling fixture developed under this work helps to reduce set up time and manufacturing lead time. With proper study and implementation of work study and method study the bottlenecks in the workstations and operations. With aim to reduce worker fatigue fixtures proved to be accurate solutions. The present work focuses on minimizing lead time as well as worker fatigue. The cost-effective solution for product results into cost savings to the company. Productivity improvement enables company to withstands in the competitive market. Number of operations like milling, slotting, drilling is accommodated in a single fixture. The operations process chart / outline process chart contributes to decide time study implementation. Bottleneck is identified and removed with the successful implementation of milling fixture.

References

  1. Prit shah, Hetal Agrawal, S P Joshi, Udayan Patel , “Design and Manufacturing of Modular Welding Fixture”, National Conference on Recent Trends in Engineering & Technology, 2011
  2. Soosung Kim, Kihwan Kim,1 Jungwon Lee, and Jinhyun Koh, “Design and Fabrication of Remote Welding Equipment in a Hot-Cell”, Hindawi Publishing Corporation, Science and Technology of Nuclear Installations, Volume 2013
  3. S.N.Shinde, Siddharth Kshirsagar, Aniruddha Patil, Tejas Parge, Ritesh Lomte, “Design of Welding Fixtures and Positiners”, International Journal of Engineering Research and General Science Volume 2, Issue 5, ISSN 2091-2730, August-September, 2014
  4. Bing Li . Hui Tang . Xiaoping Yang . Hao Wang, “Quality design of fixture planning for sheet metal assembly”, International journal of Manufacturing Technology, 2007
  5. A.H. Nalbandh, C. C. Rajyaguru, “Fixture Design Optimization Using Genetic Algorithm-A Review”, Journal of Information, Knowledge and Research in Mechanical Engineering, ISSN 0975 – 668X, Volume – 02, Issue – 02, 2013
  6. Biswajit Parida, Shiv Dayal Vishwakarma and Sukhomay Pal, “Design and development of fixture and force measuring system for friction stir welding process using strain gauges”, Springer Publication, Journal of Mechanical Science and Technology, (2015)
  7. Praveen B., Dr. Vijay Kumar M, Mr. Jagadish Mogaveera B, Mr. H. V. Vasuki, “Impact of Fixture Design on Productivity Enhancement in Fabrication of Wheel Loader's Front Chassis” International Journal for Research in Technological Studies, Vol. 2, Issue 9, ISSN (online): 2348-1439, August 2015.
  8. Jigar D Suthar, K.M .Patel, and Sanjay G Luhana, “Design and analysis of fixture for welding an exhaust impeller”, Elsevier Publication, Science Direct, Procedia Engineering 51, 514 – 519, 2013.
  9. Sneha Ubale, Sachin Lomate, Ajit Kshirsagar, “Analysis and Optimization of Fixture for the Welding Of Automotive and Non-Automotive Components”, International Journal of Advanced Research Ideas and Innovations in Technology, ISSN: 2454-132X, Volume 3 Issue 3, 2017
  10. Naveen A M, V A Girisha, Pruthvi H M, “Design and Analysis of Welding Fixture for Motor Case Assembly”, International Journal of Mechanical and Production Engineering, ISSN: 2320-2092, August 2014
  11. A. M. Mhaske, 2R. M. Metkar, 3S. D. Hiwase, “Design and Analysis of Welding Fixture for Tacking and Welding of Inner Boom of Loadall Handler”, IJRMET Vol. 5, Issue 2, May - Oct 2015
  12. Kulkarni Kaustubh A. & Patel Akshaykumar K., “Design and Development of Milling Fixture”, International Journal for Research in Engineering Application & Management (IJREAM), ISSN: 2494-9150 Vol-02, Issue 02, MAY 2016
  13. Kiran Valandi, M.Vijaykumar, Kishore Kumar S, “Development, Fabrication and Analysis of Fixture”, International Journal of Innovative Research in Science, Engineering and Technology, Vol. 3, Issue 4, April 2014.
  14. Kumara B, M. Mohan Ram, “Design and Fabrication of Lathe Fixture for Brake Drum (cargo) Machining, International Journal of Scientific and Research Publications, Volume 4, Issue 7, July 2014 1 ISSN 2250-3153
  15. Aditya Rao, Vighnesh Shinde, Raghav Upasani, Daksh Gadhia, Deepak Devasagayam, “Design and Fabrication of Keyway Cutting Fixture for Gears”, International Research Journal of Engineering and Technology (IRJET), Volume: 03 Issue: 04, e-ISSN: 2395 -0056 Apr-2016, Page number 1115-1119
  16. “Jigs and Fixtures for Machine shops” Version 2 ME, IIT Kharagpur
  17. https://en.wikipedia.org/wiki/Jig_(tool)
  18. http://engineeringhut.blogspot.com/2010/11/jigs-and-fixtures.html
  19. https://www.slideshare.net/zohaib_009/jigs-and-fixtures
  20. https://en.wikipedia.org/wiki/Productivity

Downloads

Published

2022-06-30

Issue

Section

Research Articles

How to Cite

[1]
Ingale R.P., Nalawade P. S, Shinde S. D., Shukla A. S., Bodke S. E., " Development and Modelling of Milling Fixture for Enhancement in Productivity, International Journal of Scientific Research in Science, Engineering and Technology(IJSRSET), Print ISSN : 2395-1990, Online ISSN : 2394-4099, Volume 9, Issue 3, pp.156-160, May-June-2022.