Automatic Control of Power Transfer System using PLC

Authors

  • S. S. Patole  Assistant professor of Parikrama College of Engineering Kashti, Maharashtra, India
  • B.C Gawade  Parikrama College of Engineering, Kashti Maharashtra, India
  • K.K. Mergal  Parikrama College of Engineering, Kashti Maharashtra, India
  • A.H. Bhosale  Parikrama College of Engineering, Kashti Maharashtra, India
  • A. C. K. Badve  Parikrama College of Engineering, Kashti Maharashtra, India

Keywords:

PLC, Relay bord, Contactors, Program logic.

Abstract

Power management is an important constraint in the design of various loads in industries for automation. Soi f power consumption increases then the substation monitoring is very important for the purpose of controlling the hardware and software optimization with the help of PLC ladder logic system and SCADA were used. This technique in order to reach strong conclusion about their actual impact on the power grid monitoring and control without manpower. The basic idea behind substation control project is to monitor the switchyards in substation. In substation many relays and circuit breakers are used. When any one breaker is trip because of the problems, we can monitor and control through SCADA windows. In power management project, the computer is used for assigning the priority for various loads. The signals are given to the computer of the electricity board where there is the electronic control unit which controls the sequence of disconnecting the load. On basis of controls from the computer the breakers are managed and in computer the SCADA system is installed which is used for monitoring and control. If there any problem occurs in plant, we can easily identify which part is trip. After that we can troubleshoot the problem through manpower and monitor the substation.

References

  1. International Journal of Advanced Research in Electrical, Electronics and Instrumentation Engineering” Working Phases of SCADA System for Power Distribution Networks”.Shalini1 Sunil Kumar J2 Britain Teshome3 Samra wit Botulin Muluneh4 Bit seat Tadesse Aragaw5
  2. International Journal of Electronics and Computer Science Engineering 254 “Design And Implementation Of SCADA System Based Power Distribution For Primary Substation”. Khing Thu Zar Win 1, Hla Myo Tun 2.
  3. Multidisciplinary Journal of research in Engineering and Technology .”PLC SCADA based distribution monitoring and control”. Santhosh B .Bleeker.
  4. “Automated Fault Isolation System on Low Voltage Distribution Automation System” M. M. Ahmed.
  5. International Journal of Engineering and Technology. “Using Substation Automation System for Faults Management and Analysis in Electric Power Distribution System “.Oyedeji S.A.
  6. 'Novel Automated Fault Isolation System on Low Voltage Distribution Automation System'. Muses

Downloads

Published

2023-06-30

Issue

Section

Research Articles

How to Cite

[1]
S. S. Patole, B.C Gawade, K.K. Mergal, A.H. Bhosale, A. C. K. Badve "Automatic Control of Power Transfer System using PLC " International Journal of Scientific Research in Science, Engineering and Technology (IJSRSET), Print ISSN : 2395-1990, Online ISSN : 2394-4099, Volume 10, Issue 3, pp.186-189, May-June-2023.